Testing emergency showers

Keep your equipment fit. Make sure that spray patterns, flow pressure etc. always comply with standards.

Phase 1

We are checking:


  • Marking/signs
  • Free space
  • Installation height
  • Flow test
  • Valve
  • Flowrate of water (60l/min)
  • Water distribution
  • Safety

 

Phase 2

Emptying of test Trolley


  • Emptying the water in the sink with support from the pump
  • Emptying the water in the drain with support from the valve

Phase 3

Test of Eye shower

We are checking:


  • Marking/signs
  • Free space
  • Installation height
  • Flow test
  • Valve
  • Flowrate of water (6 l/min per eye)
  • Water distribution
  • Safety

Phase 4

Test of Eye shower

We are checking:


  • Jet height

Ready to help

Do not hesitate to contact us, if you need more information about our products.

Why choose BROEN-LAB emergency showers?

USP #1
Maintain a high level of employee safety

Get tailored shower systems designed to treat body, face and eyes quickly and efficiently.

USP #2
Protect your corporate reputation

Damage control is an essential part of a responsible company’s safety plan.

USP #3
Keep production running

Quick and efficient response to accidents minimises production downtime.